Foundation... We have had this ditch since pre-Halloween, and it was as large as it was because the architect mis-measured our house and drew the foundation too big. So between recalculating math or doing extra digging, Milton chose digging. I was cool with it, makes no real diff to me. Cept it turns out we would need new drawings and new approvals to do such a thing, and so they will now be filling it in. Seems like a silly waste of work!
Otherwise everything else was good.
Foundation prep dug out back:
Not a lot happened to show, as most of the big stuff was static waiting for the inspector.
But the old door to my bedroom that was segmenting the new length of hall was taken out, and so not the hallway looks more normal (though still unfinished, and furnished with a creepy pup).
And they installed the fan in our guestroom/office.